Page 4 - Labstil ENG Katalog
P. 4

4                                                                                                                                                                                                                                          5








               PROJECT                                                                CONSTRUCTION                                                                           MECHANICAL
               CONSULTANCY                        DESIGN                              (BUILDING)                                         ELECTRICAL                          INSTALLATION

               Services                           Services                            Services                                           Services                            Services



























               Labstil staff listens, understands   Considering the intended          This stage could only be the                       Electrical projects are prepared    Ventilation ,and air conditioning
               and speaks the same language       use, the specific needs of the      restoration of an existing                         in accordance with the energy       systems, are among the most
               based on their laboratory          user, the dimensions of the         space, or the construction                         requirement of the laboratory       critical part of a laboratory
               experience above 30 years          laboratory space available,         of a new  concrete or pre-                         equipment ,and other electrical     which  are designed  by
               during  the meetings organized     alternative project design          fabricated structure. In line                      devices.                            specialized mechanical
         www.labstil.com.tr  design  a laboratory to the   line with functionality , and   mechanical, electrical, gas,                  in electrical infrastructure        requirements of each specific
                                                                                                                                                                             engineers in line with the
                                                                                      with the approved project,
                                                                                                                                         All the components used
                                                  studies are carried out in
               with customers ,aiming to
                                                                                                                                         are  meeting all the valid
               entire satisfaction of customer
                                                                                      fire extinguishing, systems
                                                                                                                                                                             laboratory.
                                                  ergonomics.
                                                                                                                                                                             Water and waste water systems
                                                                                                                                         international safety , and
                                                  3D visuals of the eligible
                                                                                      installation, and  laboratory
                                                  project are prepared and after
                                                  the customer approval, the          benches (laboratory furniture)                     quality standards                   are also part of the mechanical
                                                                                      production starts, and all are
                                                                                                                                                                             installation.
                                                  production/ construction phase      installed at site in accordance
                                                  begins.                             with approved project.
   1   2   3   4   5   6   7   8   9